Dutch house types explained: what you are buying and what it will need

Niels Veentjer · 27 August 2026 · 7 minute read

Renovated interior of a post-war Dutch house

Dutch property listings assume you know what a jaren 30 woning implies, or what to expect from a house built in 1972. For anyone who did not grow up here, those descriptions carry no information at all, which makes it hard to judge what you are actually looking at.

This guide runs through the main periods of Dutch housing stock, what each typically comes with, and what renovation usually involves. Particularly relevant in Groningen, where all of these sit within a few kilometres of each other.

The main periods

Dutch housing stock by period
PeriodWhat you getWhat it usually needs
Pre-war (before 1940)Generous rooms, high ceilings, characterFoundation checks, wiring, damp, insulation
Early post-war (1945 to 1965)Solid, plain, modest roomsInsulation, wiring, often the whole envelope
1965 to 1985Cavity walls, concrete foundations, small roomsLayout changes, more electrical circuits
1985 to 2000Reasonable insulation, practical layoutKitchen and bathroom, modest upgrades
After 2000Good insulation, mechanical ventilationMostly cosmetic

Pre-war: character and homework

The jaren 30 house is the one everyone wants: bay windows, high ceilings, decorative brickwork. It is also the one with the most to check. In Groningen, pre-war houses frequently sit on timber piles, and timber piles can rot if the groundwater level drops. There is often no cavity to insulate, single glazing, wiring from another era, and sometimes lead pipework.

None of that makes it a bad buy. It makes it a buy where the survey matters and where the renovation budget needs to be realistic. Read our guide on what a Dutch structural survey covers before you bid.

1965 to 1985: the layout problem

These are the neighbourhoods that ring most Dutch cities, in Groningen places like Paddepoel, Selwerd, Vinkhuizen and Beijum. Construction is more predictable than pre-war: concrete foundations, a genuine cavity, no lead. The catch is the layout, which separates kitchen, living room and hallway in a way that no longer suits how people live.

Opening that up is usually the largest single cost, because the internal walls are more often load-bearing than people assume. In one of our projects we installed a steel structure so the ground floor could become one space; the steel column was deliberately left visible.

What renovation costs by period

As a rough guide, our rates for a complete renovation are € 550 to € 800 per m² basic, € 800 to € 1.200 mid-range and € 1.200 to € 1.800 high-end. Where a house sits in that range depends less on its size than on its period: pre-war properties push towards the upper end because of what is hidden behind the walls, while houses from the eighties and nineties sit lower.

What to ask at a viewing

  1. What year was it built, and has the foundation ever been assessed?
  2. When was the electrical installation last renewed, and is there an earth leakage breaker?
  3. Is there a cavity, and has it been insulated?
  4. What is the energy label, and when was it last assessed?
  5. Which internal walls are load-bearing?
  6. Is the property listed, or in a protected townscape?

Those six questions tell you more about the real cost of a house than the asking price does. If you want the answers turned into numbers, we can put together a renovation plan before you bid.

Frequently asked questions

A house built in the 1930s, typically with generous rooms, high ceilings and decorative brickwork. They are sought after for their character, but they often need foundation checks, rewiring, damp work and insulation.
Because much of the western and northern Netherlands sits on peat and clay, which are compressible. Pre-war houses frequently stand on timber piles, and those can rot if the groundwater level drops.
Those built between roughly 1965 and 1985. Construction is predictable and there is usually a cavity, but the layout separates kitchen, living room and hallway in a way that suits few people now. Opening it up is often the largest single cost.
Our rates run € 550 to € 1.800 per m² depending on finish level. Pre-war properties tend towards the upper end because of what is hidden behind the walls; houses from the eighties and nineties sit lower.
Five per cent on a recent house, ten per cent on one from the seventies to nineties, and fifteen to twenty per cent on a pre-war property.
Yes. Our completed projects include a pre-war property with a timber-frame extension, a post-war house in Vinkhuizen where we installed a steel structure, and a full strip-out and rebuild in Haren.
Niels Veentjer, oprichter van VerbouwGroep Noord

Niels Veentjer

Founder of VerbouwGroep Noord · Construction, electrics and plumbing under one roof

Niels Veentjer founded VerbouwGroep Noord. With a background in electrical engineering and more than 500 completed projects across Groningen and the north of the Netherlands, he brings construction, electrics and plumbing together under one roof. In this blog he shares what he runs into on site. More about Niels →