How a Dutch renovation quote works, and how to tell a good one from a bad one

Niels Veentjer · 27 August 2026 · 6 minute read

Finished kitchen after a complete home renovation

A Dutch renovation quote is called an offerte, and comparing three of them is harder than it looks. They are rarely built the same way, the cheapest is often the one with the most left out, and the word you need to watch for is meerwerk.

This guide explains what belongs in a good offerte, what the key terms mean, and which warning signs tell you the final bill will be higher than the number on the front page.

The terms you need

Dutch quote vocabulary
Dutch termWhat it meansWhy it matters
OfferteThe quote itselfShould be itemised, not a single figure
MeerwerkAdditional work beyond the agreed scopeShould only arise by your choice or a hidden defect
MinderwerkWork removed from the scopeYou should be credited for it
StelpostA provisional sum for an item not yet chosenFine in principle, dangerous if there are many
OpleveringHandover and final inspectionThe point at which you accept the work
Vaste prijsFixed price for the described workWhat you want, where the scope is clear
RegieWork charged by hours and materialsOpen-ended; only sensible for unclear scope

What a good offerte contains

  • A description of the work per item, not one lump sum.
  • A clear statement of what is excluded. This is as important as what is included.
  • A start date and a completion date, not just a duration in weeks.
  • Demolition, waste removal and making good after installation work, explicitly named.
  • How meerwerk is agreed: in writing, priced, and approved before it is carried out.
  • What warranty applies and for how long, per element.
  • Payment terms tied to progress rather than one large amount up front.

Warning signs

A quote that is noticeably cheaper than the others is rarely a gift. Usually something has been left out, and it reappears later as meerwerk. Look for these:

  • Items described as "in overleg" or "nader te bepalen" instead of a price.
  • No list of exclusions at all.
  • Many stelposten, which means much of the price is not actually fixed.
  • Demolition and waste removal missing, although the work clearly requires them.
  • No mention of making good after electrical or plumbing work.
  • A large payment due before work starts.

How much reserve to keep

Even with a fixed price, keep something aside for the genuinely unforeseen. On a recent house five per cent is usually enough. On a house from the seventies to nineties, ten per cent. On a pre-war property, fifteen to twenty per cent, because there is more that can be hiding behind the walls.

How we do it

We work with a fixed price for the described work, including demolition, waste removal and making good, with a start and completion date. Meerwerk only arises if you change something or a hidden defect appears, and in both cases you get a price before we continue. Everything is in English, with one point of contact.

You can get a sense of the numbers first with our cost calculator, or look at what was involved in the Haren project, which was stripped back and rebuilt in sixteen weeks.

Frequently asked questions

Additional work beyond the agreed scope. It should only arise in two situations: you change something yourself, or a hidden defect comes to light. In both cases you should receive a price in writing before the work is carried out.
A provisional sum for an item that has not been chosen yet, such as tiles or sanitary ware. It is reasonable in principle, but a quote full of stelposten means much of the price is not actually fixed.
A fixed price (vaste prijs) where the scope is clear, which covers most renovations. Charging by hours and materials (regie) makes sense only where the scope genuinely cannot be defined in advance, and it leaves the total open-ended.
Compare exclusions before you compare totals. The cheapest quote is usually the one with the most left out. Check that demolition, waste removal and making good after installation work are named in each.
Five per cent on a recent house, ten per cent on one from the seventies to nineties, and fifteen to twenty per cent on a pre-war property, where more can be hidden behind the walls.
Yes. The quote, the planning and all communication on site are in English, with one point of contact throughout.
Niels Veentjer, oprichter van VerbouwGroep Noord

Niels Veentjer

Founder of VerbouwGroep Noord · Construction, electrics and plumbing under one roof

Niels Veentjer founded VerbouwGroep Noord. With a background in electrical engineering and more than 500 completed projects across Groningen and the north of the Netherlands, he brings construction, electrics and plumbing together under one roof. In this blog he shares what he runs into on site. More about Niels →